      长江口堤坝工程护底结构设计探讨

      Discussion on the Design of Bottom Protection Structure for the Yangtze River Estuary Dam Project

      • 摘要: 长江口堤坝工程受长江径流、外侧潮汐及波浪综合作用。长江径流和外侧潮汐共同作用形成了建筑物周围的沿堤流、越堤流和绕堤流,引起建筑物周边局部冲刷。波浪作用主要为外海传入的风浪及涌浪,引起堤脚沙质滩面局部冲刷。本文对常用冲刷深度计算方法及存在的问题进行梳理,采用多种方法对冲刷深度进行计算对比。结合工程场地地质条件和整体河势,对重点区域进行冲刷深度数值模拟研究及局部物理模型试验,与经验公式计算的冲刷深度进行比较分析,最终确定护底尺度,并进行了护底结构设计,为类似工程提供参考。

         

        Abstract: The Yangtze River estuary dam project is affected by the combined effects of Yangtze River runoff, external tides, and waves. The combined action of the Yangtze River runoff and external tides forms the flow along the embankment, over the embankment, and around the embankment around the building, causing local erosion around the building. The wave action is mainly caused by wind, waves, and surges from the open sea, which cause local erosion of the sandy beach surface at the foot of the embankment. This article summarizes the commonly used methods and existing problems for calculating erosion depth, and compares them using multiple methods for calculation. Based on the geological conditions of the engineering site and the overall river regime, numerical simulation research and local physical model tests were conducted on the erosion depth in key areas. The comparison and analysis with the erosion depth calculated by empirical formulas were conducted to ultimately determine the scale of bottom protection and design the bottom protection structure, providing reference for similar projects.

         

      /

      返回文章
      返回