高级检索

      水利水电工程移民综合勘测设计费新旧标准对比分析与优化建议

      • 摘要: 随着《水利水电工程建设征地移民安置规划设计规范》(SL/T 290-2024,以下简称“新标准”)的颁布施行,水利水电工程移民安置综合勘测设计费的计列方式发生系统性变化。本文以2014年颁布的《水利工程设计概(估)算编制规定》(水总〔2014〕429号,以下简称“旧标准”)与“新标准”为主要研究对象,通过系统对比分析水利水电工程移民安置综合勘测设计费新旧标准在费用构成、计费基数、取费费率等方面的差异,结合典型工程案例,量化分析新标准对综合勘测设计费的影响,并提出标准实施过程中的问题与优化建议,以期为行业实践、后续标准修订完善提供参考。

         

        Abstract: With the promulgation and implementation of the Specification on design of Land requisition and resettlement for construction of water and hydropower projects (SL/T 290-2024, hereinafter referred to as the "new standard"), the methodology for compiling comprehensive survey and design fees for resettlement in water conservancy and hydropower projects has undergone systematic changes. Focusing on the Regulation on Compilation of Design Estimate and Budget for Water Conservancy Projects (Shuizong 2014 No. 429, hereinafter referred to as the "old standard") promulgated in 2014 and the "new standard" as the primary subjects of research, this study conducts a systematic comparative analysis of the differences between the old and new standards regarding the composition of costs, fee calculation basis, and applicable rates for comprehensive survey and design fees. By incorporating typical engineering case studies, it quantitatively analyzes the impact of the new standard on these fees, identifies issues encountered during its implementation, and proposes optimization recommendations. The aim is to provide valuable references for industry practice and the future revision and refinement of relevant standards.

         

      /

      返回文章
      返回