      基于BIM+GIS的引调水工程施工进度管理

      Construction progress management for water diversion projects based on BIM+GIS

      • 摘要: 引调水工程具有工程规模大、建设周期长、施工条件复杂、协调难度大等特点。为解决传统进度管理存在的信息不对称、数据更新滞后、无法动态调优等问题,以珠江三角洲水资源配置工程为例,通过将BIM+GIS技术与进度管理业务融合,建立数据共享标准与通道,利用施工工效计算动态推演关键线路。结果表明:该技术可及时预警滞后线路,结合BIM+GIS的可视化表达,提高了工程进度分析决策效率,可助力工程安全、高效完工。研究成果可为引调水工程进度管理提供参考。

         

        Abstract: The water diversion project is characterized by large project scale, long construction period, complex construction conditions, and difficult coordination.In order to solve the problems of asymmetric information, lagging data update, and inability to dynamically adjust existing in the traditional schedule management, taking Pearl River Delta Water Resources Allocation Project as an example, by integrating the BIM+GIS technology with the schedule management business, data sharing standards and channels were established, and construction efficiency calculation were used to dynamically deduce the construction and subsequent engineering progress.The results showed that lagging lines were timely warned with this technology.Besides, in combination with the visual expression of BIM+GIS, the efficiency of project schedule analysis and decision-making was improved, helping the project to be completed safely and efficiently.This research result can provide a references for the progress management of water diversion projects.

         

      /

      返回文章
      返回